1.0 Introduction
After the slope failure at Hill 10, testing and monitoring were proposed for Hill 8, 9 and 11 at Gunung Tempurung. The aim is to constant monitored the stress performance of the ground anchor at service.
2.0 Objective
The objectives of the testing and monitoring excercise were:
- to determine the lift off load of the anchors.
- to re-stress the anchors to the original lock off load.
- to determine the long term stress loss.
3.0 Type of Tests
The various types of test carried out were:
- Lift off test
- Modified Acceptance test
- Extended Modified Acceptance test
- Long term load monitoring using load cells
4.0 No. of Test
| Type of Test | No. of Test |
| Lift off test | 80 nos |
| Modified Acceptance test | 176 nos |
| Extended Modified Acceptance test | 9 nos |
| Load monitoring | 5 nos |