TANG MAN HOI

Manager

Qualification:
B.Eng (Hons) Civil Engineering, 1985 Monash University of Australia
M.Eng Civil Engineering, 1992 Nanyang Technological University of Singapore

Thesis: Statistical Analysis For The Prediction of In-situ Characteristic Strength of Concrete.

Paper Published:
"Strengthening of weak concrete by pressure cum vacuum Impregnation with Methyl Methacrylate (MMA) Monomer" Proceeding of CONCET ’91 International Conference on Concrete Engineering and Technology, Kuala Lumpur.
"Assessment of existing concrete structures" Universiti Sains Malaysia, 1992 UDA Seminar, 1993, MBAM Seminer, 1993.
"Rehabilitation of reinforced concrete structures – from assessment to repair" JKR Seminar Batu Pahat, 1993.
Industrial
Construction

Past Experience

  • Muara Town Sewerage Scheme Phase II – Incharge of pipe laying, manhole construction, sea front protection wall and pump station construction.
  • Kuala Belaint and Seria Water and Sewerage Projects – Incharge of pipe laying, manhole construction, access road, pump house and pump station construction.
  • Research into the use of various non-destructive tests for determining in-situ concrete strength and strengthening of concrete by chemical injection.
  • Monitoring of Penang Turf Club Old Grand Stand
  • Strengthening and Rehabilitation Of Penang Turf Club Grand Stand structure
  • Strengthening to columns at Uda-Ocean Supermarket, KL Using Steel Plate Bonding
  • Strengthening by Plate Bonding to KTM Bridge Off Jalan Kuala Kangsar, Ipoh
  • Remedial Works to Double Storey houses at Setiawangsa
  • Installation of Bridge Bearings For LRT II
  • Repair to Bridge Embankment at PDS Interchange N-S Highway
  • Repair to Bridge Embankment at Skudai Interchange N-S Highway
  • Repair to Honeycomb Members at Bolton Industrial Park
  • Strengthening of Columns by Prepack Grouting at Sunway Capitol Project
  • Repair to Post Tensioned Beams at Endah Regal Condominium Project
  • Grouting to Solebahu Truning Mechanism at MRR II Project
  • Load Test and Epoxy Injection to Beams at Menara Budaya
  • Vibration Monitoring and Epoxy Injection to Cracks at B Braun Factory, Penang
  • Repair to Culvert at Km 284 N-S Highway
  • Guniting to Slope at Desa Melawati
  • Guniting to Slope at TV3. Setiawangsa
  • Slope Stabilisation and Guniting to Slope Near Gopeng N-S Highway
  • Rock Slope repair at TamanTAR
  • Guniting to Slope at Kulim Tower, JB
  • Slope Stabilisation at Bukit Tinggi Resort
  • Securing of Post Tensioned Tendons, Load Test, Fireproofing and Demolition at Swiss Inn Hotel
  • Stabilisation by Grouting To 1200mm Dia. Twin Culvert Across Karak Highway, km30.4
  • Repair to dry Admiral Dock at Keppel Shipyard Singapore
  • Strengthening of Bridge Piles Over Sg. Kerayong By Steel Jacketing
  • Rehabilitation of Penang Swimming Club
  • Underpinning and Strengthening of 3 D/S Houses at Sg. Chua Kajang
  • Strengthening to Beams and Slabs by Prepack Grouting at Fastron Factory, Penang
  • Underpinning and Strengthening D/S House at Tmn Sri Sentosa
  • Repair to Bridge Embankment at km 9.4 & km 18.5 Senai-Johor Highway
  • Repair to Bridge Embankment at km 280.5 N-S Highway
  • Repair to Bridge Embankment at Simpang Ampat N-S Highway
  • Repair to Culvert at Km 284 N-S Highway
  • Repair to Bridge Embankment at km 12.1 Senai-Johor Bahru Highway
  • Structural Investigation at Selbourne Square, Shah Alam
  • Testing and Monitoring of Meru & Menora Tunnels
  • Settlement Monitoring at Lion Suzuki Building, Shah Alam
  • Crack Width Monitoring at Bahau Flats
  • Honeycomb Detection of post Tension Beams at Endah Regal Condominium
  • Load Test to Beams at Putra Place Car Park
  • Load Test to Beams at Desa View Condominium
  • Waterproofing to Roof at Swiss Inn Hotel
  • Grouting to Leakages at J.B.A. Reservior Shah Alam