  • PROJECT QUILL 9 ANNEXE, LOT 7 PETALING JAYA FOR QUILL CONSTRUCTION SDN. BHD. – Year 2022 – PU Injection Work for Water Leakages at Basement
  • LOOK @ 118 FOR GAMUDA ENGINEERING SDN. BHD. – Year 2022 – Diamond Cutting, Beam Strengthening and Other Associated Works
  • DUTA-ULU KELANG EXPRESSWAY (PHASE 2) FOR EKOVEST PROJECT MANAGEMENT SDN. BHD. year 2022 – Re-positioning the Displacement of Elastomeric Bearing at Bridge MC30, Tun Razak Link (TRL)
  • 8TH& STELLAR @ SRI PETALING FOR GD BUILDERS SDN. BHD. – Year 2022 – Control Demolition to Existing Beam
  • SKYPARK, CYBERJAYA FOR SKY PARK PROPERTIES SDN. BHD. – Year 2023 – Assessment, Investigation & Structural Enhancement for Fire Damaged Structure
  • BANGUNAN MUZIUM DIRAJA FOR KAMAL ENGINEERING SDN. BHD. – Year 2023 – Demolition, Structural Repair and Other Associated Repair Works
  • SHOREA PARK FOR OSK CONSTRUCTION SDN. BHD. – Year 2023 – Slab, Beam Hacking and Rectification Works
  • PROJECT LANTERN BANGSAR FOR CONLAY CONSTRUCTION SDN. BHD. – Year 2023 – Concrete Repair Work at Water Tank
  • TNB PLATINUM CONVENTION CENTRE FOR SUNWAY CONSTRUCTION SDN. BHD. – Year 2023 – RC Slab Removal by Diamond Coring and Saw Cutting
  • ROJECT AURORA FOR HAB CONSTRUCTION SDN. BHD. – Year 2023 – RC Wall Strengthening
  • BRIDGE DATA CENTRE FOR JURUTERA PERUNDING SKA SDN. BHD. – Year 2023 – Structural Investigation Works
  • BUNGALOW AT BUKIT TUNKU FOR EMINENT HOME BUILDERS SDN. BHD. – Year 2023 – CFRP Strengthening Works
  • CYBERVIEW 23A BUILDING AT CYBERJAYA FOR PLM INTERIOR SDN. BHD. – Year 2023 – Control Demolition Work with Robotic Hacking
  • PEMBINAAN MASJID TERAPUNG DI DAERAH YAN, KEDAH FOR MAJU MERGE RESOURCES SDN. BHD. – Year 2023 – Structural Investigation Works
  • HYATT CENTRIC KL FOR SUNRAY CONSTRUCTION & INTERIOR SDN. BHD. – Year 2023 – Control Demolition Work with Robotic Hacking, Diamond Cutting, Tendon Locking to PT Beams
  • LRT 3 KLANG (PACKAGE GS01) FOR MUDAJAYA CORPORATION SDN. BHD. – Year 2024 – Concrete Rectification Works with Pressure Grouting
  • EKOCHERAS MALL FOR EKOVEST CAPITAL SDN. BHD. – Year 2024 – Construction and Completion of Egress Ramp Widening Work
  • PICASO HOSPITAL FOR QUILL CONSTRUCTION SDN. BHD. – Year 2024 – PU Injection Work for Water Leakages at Basement
  • LUXURA RESIDENCE FOR WONG BROTHERS’ BUILDING CONSTRUCTION SDN. BHD. – Year 2024 – Concrete Rectification Works with Pressure Grouting
  • PROJECT LAKE CITY PHASE 2 FOR CHINA STATE CONSTRUCTION ENGINEERING (M) SDN. BHD. YEAR 2024 – Control Demolition Work with Robotic Hacking and Diamond Cutting
  • PROJECT LOT 349 SENTRAL SUITES FOR MRCB BUILDERS SDN. BHD. – Year 2024 – Ramp Beam Modification Works
  • PROJECT EDUSENTRAL FOR GLOBAL ACTIVATE SDN. BHD. – Year 2024 – Corbel Rectification Works
  • RKAT HIDROGRAFI AT TLDM PULAU INDAH FOR TEKNIK SEMPURNA (M) SDN. BHD. – Year 2024 – Bridge Jacking & Realignment and Concrete Rectification Works