Past Experience
- To inspect and monitor all times each stages of construction works including structural works, external works and renovation work.
- To ensure that all materials delivered to site are conform to the approved specification.
- To ensure that all installation work based on method statement approved.
- To regularly report to relevant superiors on the progress of the works and the problem areas encountered especially in respect of defective, outstanding or non-conforming works or delayed works.
- Any other duties that may be assigned from time to time by management.
- Close coordination with architect, quantity surveyor and contractor to ensure effective teamwork.
- Provide meeting minutes for site meetings, technical meetings and other meetings.
- Attend the Site Meeting and provide feedback on the relevant scope of work.
Past Project
- Hyatt Centric KL for Sunray Construction & Interior Sdn Bhd– Year 2024 – Controlled Demolition Work with Robotic Hacking, Diamond Cutting & Steelworks Support for Derrick Crane
- Sunway Carnival Mall, Penang – Year 2022 – 2024 – Demolition and Strengthening Works
- MSM Jetty Area, Prai Factory, Penang – Year 2023 – 2024 – Carry Out Further Investigation and Repair the Damage of Concrete Structure
- Binjai On the Park for Layar Intan Sdn Bhd– Year 2024 – Rectification of Cantilever Slab
- Atria Shopping Gallery – Year 2025 – Structural and Architectural Demolition Works

